Cable size, breaker or RCBO rating, isolation, earthing and fault protection are selected after checking the manufacturer’s electrical data and the existing installation. Guessing from the unit’s cooling capacity can leave the circuit under-protected or overloaded.
Dedicated supply where required
A fixed circuit avoids relying on extension leads or an unsuitable socket circuit for permanent equipment.
Correct protection and isolation
The protective device and local isolator must suit the equipment, cable and disconnection requirements.
Inspection, testing and certification
Completed electrical work should be tested and the appropriate certificate or building-control route provided.
Electrical work in dwellings must follow
Approved Document P.
NICEIC is one recognised competent-person route, while other authorised schemes and building-control routes may also apply.